3D Industrial Engineering with ema - development of different process variants as well as planning and simulation of human-robot collaboration
Benefits through MRK workstation
Cycle time - from 30 s to 20 s
Ergonomics (EAWS) - from 52 points (red workplace) to 35 points (yellow workplace)
Process/Logistics - from production downtime with every container change to uninterrupted production due to 2 container principle
→ Productivity increase by 33%
→ less physical strain on employees
→ higher utilization