Optimization of the assembly area for hydraulic components
Dipl. Ing. K. Dietzel (Dietzel Hydraulik)
Derivation of bottlenecks from actual production status with digital factory model
Derivation of measures to reduce production costs and personnel requirements with creation of an optimal layout
Reduction in production costs (-10 %), personnel requirements (-19%) and material flow costs (-61%) with a simultaneous increase in the degree of space utilization by +30%
Digital planning & optimization of medical technology production
Ottobock Healthcare Products
Validation of planned layout concepts with digital factory model
Optimization of throughput times & production control (push/pull)
Implementation of the measures in an optimized layout to reduce production time, space and workstations